2022 China New Design Prestressed Duct Making Machine - High quality high output hot plastic pellet/pipe/cubeextruder machine plastic recycling equipment – Cuishi
2022 China New Design Prestressed Duct Making Machine - High quality high output hot plastic pellet/pipe/cubeextruder machine plastic recycling equipment – Cuishi Detail:
High quality high output hot plastic pellet/pipe/cubeextruder machine plastic recycling equipment
SJ series single screw extruder plastic machine mainly apply to extrude PP,PE,PET,PVC,ABS,PS,PA ect material.It adopt special gear box,and has features of low noisy ,stable running ,high carrying capacity,long service life .Equipped with different mold and auxiliary equipments, it could produce plastic pipe ,sheet ,board, granules and so on .It has features of simple process,high output ,stable extrusion pressure,and low cost.
Project: DJ85 single screw pelletizing line | |
Raw material & formula | PE films |
Final product | PE granules |
Output capacity | 120-200kg/h , depends on material’s characteristics. |
Central height | 1.14m |
pp pe pelletizing line plastic recycling granulating machine waste plastic granules making machine
Parameters(CS Series Double Stage Compactor-Granulator):
Model(double stage) |
CS85-100 |
CS100-120 |
CS130-150 |
CS160-180 |
CS180-200 |
Screw Diameter(mm) |
85 |
100 |
130 |
160 |
180 |
L/D |
25-42 |
25-42 |
25-33 |
25-33 |
25-33 |
Capacity(kg/h) |
150-200 |
300-350 |
500 |
600-700 |
800-1000 |
Application:
PE, PP film, Silk, Flakes (≤0.5mm), Bags, etc.
Note, our CS series compactor granulator can be pull strip cutting method, or water ring cutting method for option
Consist of:
Belt conveyor(metal detector) → Compactor → Main extruder(vacuum degassing system) → Hydraulic screen changer → Sub- extruder →
Hydraulic screen changer → Water ring cutting system →Dewatering machine → Air blow system → Storage hopper → control cabinet
1. General information
1.1 Floor space
Basic construction, earthwork, wall work should be well finished by Buyer for accepting this pelletizing line.
Buyer should supply crane, forklift or other lifting equipment, mounting materials and tools.
Area: to be designed according to line layout.
1.2 Power supply
Installed power: 106KW (practical power consumption will be approx. 70%)
Power supply:
Supply voltage: 3*380V+N+PE;
Voltage tolerance: +10%/-5%;
Control voltage: 24VDC+220VAC;
Frequency: 50Hz+-2%
Wire/cables:
- Wires/cables from power supply to control cabinet (provide by Buyer).
- All electrical cables from control cabinet to each machine (provide by Buyer).
1.3 Water supply
Consumption: 0.6T/h (water recycles)
Cooling water:
Without dissolved or suspended minerals as phosphor, sulphur, iron, etc.
Inflow temperature T1: max. 15℃
Outflow temperature T2: T2=T1+5℃
Inflow pressure, min: 2.5 bars
Hardness: 5-8ºdH;
Reflux: without pressure
Water hose:
From water supply to every single machine (provided by Buyer).
1.4 Compressed air: 0.6M3/min, 0.4~0.7Mpa
1.5 Operation staff
2-3 People
1.6 Lubrication oil
Acquired in the local market on the recommendation of Seller (provide by Buyer).
2. Commercial terms
2. 1Machine list & Price
No. |
Device Name |
Model |
Qty(set) |
1 |
Belt conveyor |
|
1 |
2 |
Compactor |
|
1 |
3 |
DJ85/33 single screw extruder |
DJ85/33 |
1 |
4 |
Plate type Hydraulic screen changer160 |
|
1 |
5 |
Water ring cutting system |
|
1 |
6 |
Vibrating screen dewatering machine |
|
1 |
7 |
Silo |
|
1 |
8 |
Electric cabinet |
|
1 |
2.2 Payment terms
- 40% as deposit by T/T.
- 60% as balance by T/T before delivery and after inspection.
2.3 Delivery time
In 50 working days from the date of receiving deposit.
2.4 Packing
Plastic film.
2.5 Warranty
13 months for mechanical parts from date of bill of lading. Three months guarantee for electric elements if power supply in Buyer’s factory is not stable.
cuishi will charge the Buyer cost price of spare parts after the equipment out of warranty and provide long-term technical guide.
2.6 Installation & Commissioning
- Buyer should get prepared for installation when the equipment arrived, such as power supply, water supply, labors and cranes, etc.
- cuishi will prepare for visa application for the engineers, who will go to Buyer’s factory for commissioning job.
- Buyer should afford round-trip air tickets for the engineers if visa application is approved, and bear expenses generated such as visa formalities, meals, accommodation and allowance of USD100 per day for each engineer.
2.7 Validity
- 60 days from quotation date.
3. Technical specification
3.1DJ85 Single screw extruder
3.2Spare Parts: FOC
Mechanical part
No |
Name |
Unit |
Qty |
1 |
Hot cutting blade |
pieces |
2 |
2 |
Screw removal tool |
set |
1 |
3 |
Asbestos gloves |
pair |
1 |
4 |
Input and output shaft oil seal |
set |
1 |
5 |
Vacuum O-ring |
pieces |
2 |
Electrical parts
No |
Name |
Unit |
Qty |
1 |
AC contactor |
pieces |
1 |
2 |
Button |
pieces |
2 |
3 |
Temperature table |
pieces |
1 |
4 |
Thermocouple |
pieces |
2 |
4.Inspection before Delivery
The Seller is responsible for arranging test run before delivery.
Product detail pictures:
Related Product Guide:
Good quality comes to start with; service is foremost; organization is cooperation" is our enterprise philosophy which is regularly observed and pursued by our firm for 2022 China New Design Prestressed Duct Making Machine - High quality high output hot plastic pellet/pipe/cubeextruder machine plastic recycling equipment – Cuishi , The product will supply to all over the world, such as: Guyana, Denmark, Mauritania, We've been always creating new technology to streamline the production, and give products with competitive prices and high quality! Customer satisfaction is our priority! You can let us know your idea to develop unique design for your own model to prevent too much similar parts in the market! We are going to present our best service to satisfy all your needs! Remember to contact us right away!
By Hazel from Spain - 2017.06.19 13:51
We have been appreciated the Chinese manufacturing, this time also did not let us disappoint,good job!
By Fiona from Costa Rica - 2017.01.28 18:53